Construction management · Installation · Site services

Complex builds.
Connected.

The ground beneath it. The structure around it. The systems within it. We bring the work together.

Built on real experience160-foot viastore
crane installation
See the actual project ↗
Data Center Steel Erection — 700 MW Data Center Campus
Data center construction700 MW. Seven buildings.
AutoStore Robots & Controls — AutoStore Installation
Warehouse automationFrom grid to pick station.
KNAPP manufacturer reference showing OSR Shuttle systems
Shuttle-system experienceCM. Install. Maintain.Manufacturer reference image
A connected approach

From the ground.
To what’s next.

Projects move through people, structures and systems. Choose the part you need us to lead—or bring us in to connect the whole build.

Big scope.
Real field work.

Inside the projects ↗
Structure · Systems · Site

See how the
work connects.

Explore the building, automation and site model, then follow it into the actual project photographs.

Data center construction projectIllustrative coordination model
100,000-pound UPS installation
700 MW campus · seven buildings

Structure, power & cooling.

Steel construction, utility buildings, dry-cooler lifts and UPS placement—project progress across a mission-critical campus.

Explore the project ↗
Our software · SiteReadout SOLO

The work moves.
The record follows.

Built for the person walking the job. SiteReadout connects project context, photos and field notes with reports, open issues and finished records.

Keep the project overview and command dashboard within reach, from the site to the office.

Step inside SiteReadout ↗
SiteReadout SOLO mobile interface: Projects Overview and Project Command, showing RFIs, open issues, submittals, inspections, punch list and risk register
A Summit Peak Builders software productExplore SiteReadout ↗
CM · Installation · Preventive maintenance

Shuttle systems.
From install to upkeep.

Construction and project management, installation, service and preventive maintenance for automated storage systems. Our experience includes vendor systems from KNAPP, including OSR 15/35, as well as TGW and viastore.

Explore shuttle-system experience
KNAPP manufacturer reference photo of OSR shuttles moving totes through storage racks
OSR Shuttle system-family reference photo, provided by KNAPP. Photo: KNAPP ↗
Fleet rentals

The right equipment.
For the work ahead.

Excavators, skid steers, dump trucks, trailers and attachments. Explore the fleet, then send the equipment type, rental dates and job location.

Availability, pricing, delivery and rental terms are confirmed before equipment is released.

Browse fleet rentalsRental terms & conditions ↗
Land Clearing & Timber Handling — Land & Site Services

Start at
ground level.

Drainage, excavation, clearing and forestry mulching. Build the site conditions that make the next phase possible.

Excavation & Drainage Work — Site DevelopmentLand & site services ↗

One clear path
through the build.

From defining the work to handing it over, every phase needs to connect to the next.

Plan

See the whole scope.

Work through priorities, sequence, budget and site access before mobilization.

Coordinate

Close the gaps.

Bring trades, equipment and logistics together as the project takes shape.

Turn over

Make the next step clear.

Connect field progress, remaining work and documentation at handoff.

Your next move starts here

Bring the vision.
We’ll build the way.

Tell us what’s nextCall now

Project photograph

Data center steel erection project photograph

View the project ↗