TGW Crane System & Service Mezzanine
TGW crane-system installation with a service mezzanine and inbound and outbound conveyors connecting the storage and handling areas.
Warehouse automationGo from the big picture to the equipment, systems and field decisions behind it. Actual project photographs, with the scope explained.

Construction progress across a seven-building data center campus, connecting building work with power, cooling and equipment placement.

A warehouse installation connecting the TGW crane system with service access and inbound and outbound conveyors.

Multiple AutoStore installation scopes: grid structures, pick stations, mezzanines, conveyors and automated packaging equipment.

A 160-foot viastore crane installation in a rack-supported automated warehouse, documented from the aerial structure to the controls inside.
39 views into the work. Find a system, explore a scope, or open a photograph to compare its original and enhanced versions.
39 photographs
TGW crane-system installation with a service mezzanine and inbound and outbound conveyors connecting the storage and handling areas.
Warehouse automationAutoStore installation with high-speed I-Pack boxing equipment and conveyors. I-Pack folds cartons to fit their contents and closes them with glued lids.
Warehouse automationSteel mezzanine framing assembled before the AutoStore equipment and pick-station buildout.
Warehouse automationAutoStore grid erection with adjacent mezzanine access and installation equipment on the active warehouse project.
Warehouse automationThe fully erected AutoStore installation, including its enclosure, service access and fire-suppression system.
Warehouse automationStructural steel columns, beams and elevated framing during mezzanine construction inside an industrial facility.
StructuresThe after view of the renovation's drywall phase, showing the updated walls and open living area.
RenovationsInterior renovation progress following drywall installation, with finish work underway.
RenovationsExposed framing and insulation before drywall and interior buildout. Compare with the after view of the same renovation.
RenovationsWall-panel and building-envelope installation on one of seven buildings within the 700 MW data center campus.
Data centersStructural steel and crane operations during construction of one of the campus's seven buildings.
Data centersCrane operations for dry-cooler placement during construction of one of seven buildings on the 700 MW campus.
Data centersSteel-frame construction on one of the seven buildings forming the 700 MW data center campus.
Data centersExcavation and stonework for a drainage crossing, with Summit Peak equipment preparing the surrounding site.
Excavation & siteworkA track loader with a forestry-mulching attachment processing vegetation for land clearing and site preparation.
Forestry & clearingAn excavator handling felled timber during woodland clearing and site preparation.
Forestry & clearingForestry mulching along a cleared slope to open access and prepare the work area.
Forestry & clearingAn excavator loading soil into a dump truck during residential site development and construction.
Excavation & siteworkEquipment working through brush and timber during the clearing of a wooded site.
Forestry & clearingAn excavator loading an articulated dump truck, supporting bulk material movement on the construction site.
Excavation & siteworkMobile-crane and structural coordination during construction of one of the campus's seven buildings.
Data centersA hot-aisle containment (HAC) system delivered inside the data center building for lifting into place. Containment separates the servers' hot exhaust air from the cooling supply.
Data centersCrane placement of a 100,000-pound uninterruptible power supply (UPS) onto its concrete pad, ready for the electrical team's connections.
Data centersUtility-building construction for the campus's main switchgear and connections among the substation, transformers, UPS equipment and interior switchgear.
Data centersPick-station equipment positioned beside the AutoStore grid during another installation, with overhead systems and conveyor interfaces being coordinated.
Warehouse automationA top-of-grid construction detail beside the mezzanine and safety railings used for system access.
Warehouse automationPick-station areas and conveyor connections being installed along the automation aisles of another AutoStore project.
Warehouse automationRobot and control installation over the AutoStore grid, with guarding and operator workstations in place.
Warehouse automationPick-station interfaces, the mezzanine and the enclosure during another AutoStore installation, connecting the grid to operator work areas.
Warehouse automationA 160-foot viastore crane installation in a rack-supported automated warehouse. The aerial view shows the racking, building framework and roof installation.
Warehouse automationControls, electrical connections and safety guarding inside the rack-supported building for the 160-foot viastore crane installation.
Warehouse automationDry-cooler equipment installed on a rooftop steel access platform as part of a data center cooling installation.
Data centersConcrete-foundation work for another switchgear utility building on the same 700 MW data center campus.
Data centersConveyor installation for the AutoStore project, connecting incoming material and outbound order flow around the automated system.
Warehouse automationDry-cooler installation supporting a chiller project spanning five buildings, with four chillers per building.
Data centersPower cabling for the campus's uninterruptible power supply (UPS) system during electrical-distribution installation.
Data centersBelow-grade concrete placement and utilities preparation for automatic transfer switch (ATS) equipment serving the data center's UPS system.
Data centersConcrete equipment bases and cable connections prepared for automatic transfer switch (ATS) switchgear installation.
Data centersExcavation and foundation preparation for high-voltage switchgear service runs on the data center project.
Data centersTry another system name or reset the filters to see all project work.