700 MW data center campus

Construction progress across a seven-building data center campus, connecting building work with power, cooling and equipment placement.

Data Center Steel Erection — 700 MW Data Center Campus
Steel-frame construction on one of the seven buildings forming the 700 MW data center campus.
Scope & involvement

Seven buildings. One connected campus.

700 MW campus7 buildings100,000 lb UPS placement

Our work includes construction management and field coordination across structural work, equipment access, utility infrastructure and systems installation. The photographs document individual scopes and stages on the campus.

Structure & access
Steel erection, envelope progress and crane coordination around the buildings.
Power infrastructure
Switchgear utility buildings, ATS infrastructure, UPS cabling and equipment-pad preparation.
Equipment placement
Dry-cooler lifts, hot-aisle containment delivery and placement of a 100,000-pound UPS for electrical connections.

Project photographs.

Open a photograph for the stage, scope and original/enhanced comparison.

700 MW Data Center Campus

Data Center Building Envelope

Wall-panel and building-envelope installation on one of seven buildings within the 700 MW data center campus.

Data centers
700 MW Data Center Campus

Data Center Structural Steel

Structural steel and crane operations during construction of one of the campus's seven buildings.

Data centers
700 MW Data Center Campus

Data Center Dry Cooler Lifts

Crane operations for dry-cooler placement during construction of one of seven buildings on the 700 MW campus.

Data centers
700 MW Data Center Campus

Data Center Steel Erection

Steel-frame construction on one of the seven buildings forming the 700 MW data center campus.

Data centers
700 MW Data Center Campus

Data Center Crane Coordination

Mobile-crane and structural coordination during construction of one of the campus's seven buildings.

Data centers
700 MW Data Center Campus

Hot-Aisle Containment Delivery

A hot-aisle containment (HAC) system delivered inside the data center building for lifting into place. Containment separates the servers' hot exhaust air from the cooling supply.

Data centers
700 MW Data Center Campus

100,000-Pound UPS Installation

Crane placement of a 100,000-pound uninterruptible power supply (UPS) onto its concrete pad, ready for the electrical team's connections.

Data centers
700 MW Data Center Campus

Main Switchgear Utility Building

Utility-building construction for the campus's main switchgear and connections among the substation, transformers, UPS equipment and interior switchgear.

Data centers
700 MW Data Center Campus

Switchgear Utility Building Foundations

Concrete-foundation work for another switchgear utility building on the same 700 MW data center campus.

Data centers
700 MW Data Center Campus

UPS Power Cabling

Power cabling for the campus's uninterruptible power supply (UPS) system during electrical-distribution installation.

Data centers
Data Center Power Infrastructure

ATS Infrastructure Installation

Below-grade concrete placement and utilities preparation for automatic transfer switch (ATS) equipment serving the data center's UPS system.

Data centers
Data Center Power Infrastructure

ATS Switchgear Bases & Cabling

Concrete equipment bases and cable connections prepared for automatic transfer switch (ATS) switchgear installation.

Data centers
Data Center Power Infrastructure

High-Voltage Switchgear Runs

Excavation and foundation preparation for high-voltage switchgear service runs on the data center project.

Data centers
Your next move starts here

Bring the vision.
We’ll build the way.

Tell us what’s nextCall now

Project photograph

Data center steel erection project photograph

View the project ↗