AutoStore relocation
Grid dismantling and reassembly, bins and barcode identification, robots, charging equipment, ports and associated service structures within the agreed scope.
Explore AutoStore relocationFrom individual equipment moves to a coordinated facility relocation, Summit Peak brings planning, field leadership and installation experience to the move.
A warehouse move brings together the facility you are leaving, the equipment you want to keep and the building that will receive it. We manage those interfaces as one relocation scope.
We coordinate site surveys, equipment identification, dismantling, protective packaging, rigging, transport, receiving-site readiness and mechanical reinstallation. Electrical and engineering work is coordinated with appropriately licensed professionals.
Plan your warehouse move
Start with the system. We will build the relocation plan around its condition, configuration and destination.
One coordinated plan, with the equipment, receiving facility and operating schedule considered together.
Review as-built information, equipment inventory and condition, access, shutdown windows and receiving-site requirements before setting the move sequence.
Document and label components, coordinate electrical isolation, dismantle the agreed equipment and prepare it for handling.
Coordinate packaging, palletizing or crating, loading, transport, unloading and destination staging around the installation sequence.
Coordinate layout, anchorage and mechanical installation, complete agreed quality checks and turn over the work to the designated commissioning team.
We also plan moves involving warehouse racking, conveyors, mezzanines, workstations and other material-handling equipment. The relocation scope is confirmed after reviewing what can be reused and what the receiving building needs.
Current and destination locations, drawings or layout, equipment list, photographs, target move dates and the operating constraints your team needs us to work around.
Discuss a relocationYes. Our scope can bring together project management, dismantling, logistics, receiving-site preparation and reinstallation, with trade responsibilities agreed before mobilization.
Reuse depends on equipment condition, engineering requirements and suitability for the destination. Repairs, replacement parts, revised layouts and building alterations are identified and scoped separately.
Controls, software integration, manufacturer approvals, commissioning and operational acceptance are coordinated with the owner, vendor and designated integrator under an agreed responsibility plan.