KNAPP equipment relocation

KNAPP equipment relocation

We relocate KNAPP warehouse equipment, bringing project management and installation experience to dismantling, transport and mechanical reinstallation.

Shuttle systems · Conveyors · Material handling

System experience.
A coordinated relocation.

Our experience includes construction management, installation and service work around KNAPP OSR 15/35 shuttle systems. We bring that field perspective to your equipment relocation.

Whether the move involves a defined equipment area or a broader warehouse project, we review the existing configuration, identify the equipment and connections, and coordinate the physical move with the owner and system team.

Discuss your KNAPP equipment
Manufacturer reference photo of the KNAPP OSR Shuttle system family
KNAPP OSR Shuttle system-family reference. Photo: KNAPP. This manufacturer image is not a Summit Peak relocation photograph.

Relocate with the
system interfaces in view.

One coordinated plan, with the equipment, receiving facility and operating schedule considered together.

  1. Review the system

    Define what is moving.

    Confirm equipment models, layout and condition, inventory, drawings, service access, operating constraints and the approved destination arrangement.

  2. Document & dismantle

    Keep identification intact.

    Record equipment and connection references, coordinate electrical isolation and sequence dismantling, protection and handling.

  3. Move & reinstall

    Bring the physical scope together.

    Coordinate packaging, rigging, transportation, receiving and mechanical reinstallation of the agreed shuttle, conveyor and associated equipment scope.

  4. Prepare the handoff

    Connect installation to startup.

    Complete agreed mechanical checks and punch-list work, then coordinate handover for controls, software, testing and commissioning by the designated system team.

Plan the move.
Support what follows.

Project management can connect shutdown windows, trade interfaces, transport and receiving-site readiness. Preventive maintenance and service support can be scoped around the relocated equipment and vendor requirements.

Installation, service & preventive maintenance

Agree the technical responsibilities.

System suitability, revised configurations, controls, PLC programming, software licenses, integration, manufacturer approvals and commissioning are reviewed with the owner and designated vendor or integrator. They are included only where expressly agreed.

Explore full warehouse relocation
Before the move

Relocation questions

Which KNAPP experience supports the service?

Our experience includes OSR 15/35 shuttle-system CM, installation and service. We review the specific model, equipment condition and documentation before confirming a relocation scope.

Can you include conveyors and associated equipment?

Yes, those items can be reviewed and included in the agreed physical relocation plan, with the connection points, structural requirements and controls interfaces defined.

Does the relocation include KNAPP software or commissioning?

Those responsibilities are defined with the owner and designated system team. Our physical relocation scope does not automatically include software access, licenses, PLC changes, manufacturer approvals or commissioning.

Project photograph

Data center steel erection project photograph

View the project ↗